09.09.2010 / 09:18


Chemicals



Boiler water conditioning



JUDO JTH-L dosing agent
(liquid product ready for dosing)

Application area:

Primarily warm water heating systems

Action:

Corrosion inhibition, protective film formation

Concentration:

At least 1 l per 200 l system contents

Confirmation:

At least 250 mg/l molybdenum (JTH-ML measuring device)


Description JTH-L (PDF, German, 90 KB)
Safety data sheet JTH-L (PDF, German, 30 KB)


JUDO JTH-R dosing agent
(liquid product ready for dosing)

Application area:

Primarily warm water heating systems

Action:

Cleaning of older heating circuits, with repeated use if necessary. The system should be flushed out, refilled and conditioned with JTH-L approx. 4 weeks after the addition of JTH-R.

Concentration:

Approx. 1 l per 200 l system contents


Description JTH-R (PDF, German, 87 KB)
Safety data sheet JTH-R (PDF, German, 40 KB)


JUDO JH 1 dosing agent
(product in powder form)

Application area:

Primarily warm water heating systems with a heating output of over 100 kW (VDI 2035)

Action:

Alkalisation, oxygen bonding in boiler supply water and residual hardness precipitation

Preparation:

Approx. 100 – 150 ml per m³ system contents or supply water

Concentration:

As a 10 % solution with softened water

Confirmation:

Approx. 5 – 10 mg/l phosphate (PO43-), see boiler operating instructions
Approx. 5 – 10 mg/l excess sulphite, see boiler operating instructions (sample water cooler required)
Approx. 5 – 10 mg/l excess sulphite for warm water heating systems (VDI 2035, sample water cooler required)


Description JH 1 (PDF, German, 45 KB)
Safety data sheet JH 1 (PDF, German, 86 KB)


JUDO JHL 2 dosing agent
(liquid product ready for dosing)

Application area:

Primarily warm water heating systems with a heating output of over 100 kW (VDI 2035)

Action:

Alkalisation, oxygen bonding in boiler supply water and residual hardness precipitation

Concentration:

Approx. 100 – 150 ml per m³ system contents or supply water

Confirmation:

Approx. 5 – 10 mg/l phosphate (PO43-), see boiler operating instructions
Approx. 5 – 10 mg/l excess sulphite, see boiler operating instructions (sample water cooler required)
Approx. 5 – 10 mg/l excess sulphite for warm water heating systems (VDI 2035, sample water cooler required)

Description JHL 2 (PDF, German, 38 KB)
Safety data sheet JHL 2 (PDF, German, 132 KB)


JUDO JHL 3 dosing agent
(liquid product ready for dosing)

Application area:

Boiler systems above 100 °C

Action:

Alkalisation, oxygen bonding in boiler supply water and residual hardness precipitation

Dosing:

Approx. 100 – 150 ml per m³ of supply water

Preparation:

As a 10 % solution with softened water

Confirmation:

Approx. 5 – 10 mg/l phosphate (PO4), see boiler operating instructions, oxygen removal from water (sample water cooler required)


Description JHL 3 (PDF, German, 88 KB)
Safety data sheet JHL 3 (PDF, German, 131 KB)


JUDO JH 4 dosing agent
(product in powder form)

Application area:

Steam boiler systems

Action:

Reduction of alkalinity and residual hardness precipitation

Dosing:

Approx. 100 – 200 ml per m³ of supply water

Preparation:

As a 10 % solution with softened water

Confirmation:

Approx. 5 – 10 mg/l phosphate (PO4), see boiler operating instructions

Description JH 4 (PDF, German, 93 KB)
Safety data sheet JH 4 (PDF, German, 51 KB)


JUDO JH 5 dosing agent
(product in powder form)

Application area:

Boiler systems

Action:

Alkalisation and residual hardness precipitation

Dosing:

Approx. 100 – 200 ml per m³ of supply water

Preparation:

As a 10 % solution with softened water

Confirmation:

Approx. 5 – 10 mg/l phosphate (PO4), see boiler operating instructions


Description JH 5 (PDF, German, 81 KB)
Safety data sheet JH 5 (PDF, German, 156 KB)


JUDO JNS dosing agent
(product in powder form)

Application area:

Boiler systems

Action:

Oxygen bonding in boiler water

Dosing:

Approx. 80 ml per gram of oxygen (02) per m³ of supply water

Preparation:

As a 10 % solution with softened water

Confirmation:

Approx. 5 – 10 mg/l excess sulphite, see boiler operating instructions (sample water cooler required)
approx. 5 – 20 mg/l excess sulphite for warm water heating systems (VDI 2035, sample water cooler required)


Description JNS (PDF, German, 79 KB)
Safety data sheet JNS (PDF, German, 153 KB)


JUDO JHL 10 dosing agent
(liquid product ready for dosing)

Application area:

Steam boiler systems

Action:

Oxygen bonding in boiler water

Dosing: Approx. 60 ml per gram of oxygen (02) per m³ of supply water

Confirmation:

Oxygen removal from water (sample water cooler required)


Description JHL 10 (PDF, German, 84 KB)
Safety data sheet JHL 10 (PDF, German, 59 KB)



Imprint: © JUDO Water Treatment GmbH 2007
All rights reserved. Data Protection.
Webmaster: Timo Weisshaar
powered by JUDO - Version 6.1.0.1

Why is water treatment necessary?
Water is the basis of all life on Earth, and clean drinking water is particularly important...

Go...
How to combat rust and rusty water?
The waterworks supplies hygienically pure drinking water however, on the way from the waterworks, incrustations become dissolved and get into the water pipe. It is also unavoidable that a certain level of contamination occurs to drinking water as a result of work on the public pipeline system. The results are well-known – brown, rusty water, problems with shut-off and control fittings, dripping taps ...
Go...
How to combat limescale?
By far the highest proportion of fresh, drinking water used in the modern household is used for washing, baths and showers, water for dishwashers and washing machines and for various cleaning tasks...
Go...
Juwelized water?
To be able to enjoy fresh, sparkling spring water is a very attractive idea. The drinking water that comes out of our taps complies with all the legal requirements, but due to its transport through extensive and sometimes old pipework systems, it has lost many of its original properties...
Go...